Structural Steel Fabrication and Erection

Northern California’s Premiere Choice for Structural Expertise

Center of Hope

Steel-Crete fabricated and installed the roughly 70-ton structural steel package for the Center of Hope apartments in Redding, CA, in 2020.
Redding, CA

Fire Station 4

We fabricated and installed miscellaneous and structural steel for Fire Station 4 in Menlo Park, CA, including the exterior stairs and metal decking.

The exterior stairs weighed 4800lbs per flight, making them our heaviest stairs to date.
Menlo Park, CA

Vacaville High Gym

The structural package for Vacaville High Gym included a 98-foot-long beam with a 40X249 profile.
The beam needed to be cambered at 5 inches, which was achieved by cutting wedges out of the beam and full-pen welding it back together.
Vacaville, CA